PROJECT DURATION
6 Weeks

PROJECT VALUE
£95,000

SERVICES PROVIDED
• To remove and dispose of asbestos insulation residue circa 1m2 to L02.
• To remove and dispose of asbestos thermal insulation residue to pipework
<0.5Lm to L02.
• To remove and dispose of M.M.M.F insulation circa 104m2 as contaminated
waste to L02.
• To remove and dispose of M.M.M.F pipe insulation circa 30Lm as
contaminated waste to L02.
• To carry out a fine clean circa 104m2 L02.
• To remove and dispose of asbestos thermal insulation debris circa 0.5m2
within wall penetration to L07.
• To remove and dispose of M.M.M.F insulation circa 104m2 as contaminated
waste to L07.
• To remove and dispose of M.M.M.F pipe insulation circa 30Lm as
contaminated waste to L07.
• To carry out a fine clean circa 104m2 L07.
• To remove and dispose of asbestos thermal insulation <0.5m2 to timber beam
within L05/6.
• To remove and dispose of M.M.M.F insulation circa 132m2 as contaminated
waste to L05/6.
• To remove and dispose of M.M.M.F pipe insulation circa 80Lm as
contaminated waste to L05/6.
• To carry out a fine clean circa 132m2 L05/6.
• To remove and dispose of asbestos thermal insulation <0.5m2 to timber beam
within L03/4.
• To remove and dispose of M.M.M.F insulation circa 132m2 as contaminated
waste to L03/4.
• To remove and dispose of M.M.M.F pipe insulation circa 80Lm as
contaminated waste to L03/4.
• To carry out a fine clean circa 132m2 L03/4.
• To remove and dispose of textured coating complete with plasterboard
ceilings to specified areas circa 533.12m2 within the ground floor.
• To remove and dispose of single skin non-asbestos plasterboard ceilings to
specified areas circa 533.12m2 within the ground floor.

BEFORE

PROJECT RESULT
The project was completed on time and within budget and our client was fully
satisfied with the end result.