Skip Navigation
Amstech Group
  • Home
  • Services
    • UKAS Accredited Asbestos Surveys & Testing
    • Licensed Removals & Remediation
    • UKAS Accredited Laboratory Testing
    • Asbestos Consultancy
    • Thermal Insulation
    • Emergency Call Out
  • Emergency Call Out
  • Asbestos awareness course
  • About
    • Case Studies & Projects
    • Our Company
    • Our Family
    • Accreditations
    • Where we work
    • Jargon Buster
  • What’s new
    • Global Asbestos Awareness Week
    • Staff Achievements
    • What is asbestos?
    • Where could asbestos be in my home or workplace?
    • Join Our Family
    • Asbestos Facts
    • HSE Latest Information
    • PAGABO Framework
    • Latest news from Amstech
  • Contact us

Carbon Reduction Plan

 

Bidder name: Amstech Group Limited

Publication date: 24/07/2024

Commitment to achieving Net Zero

Amstech Group Limited is committed to achieving Net Zero emissions by 2050.

Baseline Emissions Footprint

Baseline emissions are a record of the greenhouse gases that have been produced in the past and were produced prior to the introduction of any strategies to reduce emissions. Baseline emissions are the reference point against which emissions reduction can be measured.

 

Baseline Year: 2024
Additional Details relating to the Baseline Emissions calculations.
Amstech Group has not previously assessed or reported emissions, as such, all figures indicated are speculative at present. We are in the process of engaging with a third-party auditor to conduct emissions calculations in order for us to report on accurate emissions figures by Q1 2025. As such, our baseline year and current emissions are the same.
Baseline year emissions:
EMISSIONSTOTAL (tCO2e)
Scope 1130
Scope 218.58
Scope 3

(Included Sources)

191.75
Total Emissions340.33

 

Current Emissions Reporting

Reporting Year: 2023-2024
EMISSIONSTOTAL (tCO2e)
Scope 1130
Scope 218.58
Scope 3

(Included Sources)

191.75 (business travel)
Total Emissions340.33

 

Progress against these targets will be reported by Q1 2025 as indicated above.

Carbon Reduction Projects

Completed Carbon Reduction Initiatives

The following environmental management measures and projects have been completed or implemented since inception. The carbon emission reduction achieved by these schemes equate to circa. 100 tCO2e, a 33% reduction against our initial calculations (not included against our baseline, as this has been an approximate calculation carried out in 2024), and the following measures will be in effect when performing the contract

  • Auditing by ISO14001 and certification against this standard
  • Adoption of carbon reduction measures at our office (e.g. recyclable cartridge bins, recyclable wastage bags, recycled toilet paper, etc.)
  • Operation of BlueMotion vehicles for our on-site staff

In the future we hope to implement further measures such as:

  • Replacing our existing BlueMotion vehicles with hybrid vehicles for all on-site staff
  • Appointment of an external party/auditor to calculate our emissions accurately and provide transparent, fully accurate reporting on our carbon footprint
  • Sign up to the SBTI

Declaration and Sign Off

 

This Carbon Reduction Plan has been completed in accordance with PPN 06/21 and associated guidance and reporting standard for Carbon Reduction Plans.

Emissions have been reported and recorded in accordance with the published reporting standard for Carbon Reduction Plans and the GHG Reporting Protocol corporate standard[1] and uses the appropriate Government emission conversion factors for greenhouse gas company reporting[2].

Scope 1 and Scope 2 emissions have been reported in accordance with SECR requirements, and the required subset of Scope 3 emissions have been reported in accordance with the published reporting standard for Carbon Reduction Plans and the Corporate Value Chain (Scope 3) Standard[3].

This Carbon Reduction Plan has been reviewed and signed off by the board of directors (or equivalent management body).

Signed on behalf of the Bidder:

Date: 24/07/2024

Get in touch
info@amstech.co.uk

01273 510011

Amstech Group
Unit D & F, The Rich Industrial Estate
Avis Way Newhaven
East Sussex, BN9 0DU
United Kingdom

What we do
UKAS Accredited Asbestos Surveys Licensed Asbestos Removals Asbestos Consultancy UKAS Accredited Asbestos Lab Testing Thermal Insulation FREE QUOTATION
Where we work
Nationwide East Sussex West Sussex Kent London Hampshire Surrey Berkshire Buckinghamshire Hertfordshire Wiltshire Dorset Cambridgeshire
Responsibility
Accreditations Licensed contractor Jargon Buster Carbon Reduction Plan

© 2024 All Rights Reserved.
Amstech Group Limited. Company Number : 5843035

Terms of service Privacy policy Accessibility

Memberships and Accreditations

By continuing to use the site, you agree to the use of cookies. Read more about our cookies

I'm ok with cookies